A&M's response to Waste Management's RFP. From static rules to real-time decision support — a Collections pilot built as an enterprise-scalable model. Waste Management has built the discipline; here is how A&M will turn it into a continuous learning system for driver safety, and why we are the right partner to deliver it.
A short introduction to how A&M would approach Waste Management's Driver Safety Playbook Transformation, and why the Collections pilot is the right place to start.
Waste Management's Operations and Safety Rules Book for Post Collection Operations created consistency across a large, diverse Collections workforce. A static, paper-based reference cannot support the thousands of in-the-moment decisions drivers make each day, or capture and apply what is learned from how work is actually performed.
Significant investment in safety technology and standardized rules has delivered consistency — but not yet the step-change in safety performance it was meant to unlock.
The gap this transformation closesFive conditions limit what the current Rules Book can do:
Build a field-integrated driver safety system, SafeIQ, that combines updated safety rules with standardized work and makes applying them dynamic, contextual and interactive. Safety learning happens at the start of every shift based on that day's route. Execution and variance against the standard are captured for coaching and for updating the standard.
Why it is different: WM captures learning from variation before behavior becomes an event. Drivers are participants in improving the system (HOP: with the frontline, not to it). Technology enables the system; it is not the transformation.
Measurable change in operator understanding of safety thinking delivers fewer repeat at-risk behaviors, more behavior-specific coaching, faster incident-to-update cycles and targeted reductions in WM's highest-risk incident categories. The Collections pilot becomes the enterprise template.
The right standard for this work, right now. We make standardized work dynamic, contextual and interactive. One loop runs across the shift: context, standardized work, execution, variation, feedback and coaching, learning, and an improved standard. There is one WM way of doing things, and everyone is responsible for improving it.
Leadership training to shift the mindset from compliance-driven to performance-driven.
Updated rules mapped to questions, microlearnings and interactive exercises, scaled easy, medium and hard.
Defined levels and an operator maturity profile from beginner to advanced.
Content personalized per shift by route, truck, location, weather, traffic and operator maturity.
Proactive data (SafeIQ) and reactive data (DriveCam) together guide coaching.
Geofencing and customer details defined; variation to standard captured.
Operator feedback captured, content improved, progress linked to recognition.
A single operating standard everyone is responsible for improving — with the frontline, not to it.
Personalized safety briefing; truck and route-specific checklist.
Contextual hazard alerts; point-of-work decision support.
Backing standard and sequence; site-specific risk reminders.
Facility-specific guidance; changing-condition alerts.
Capture exceptions and observations; close-out and maintenance inputs.
Immediate response protocol; guided documentation and escalation.
Targeted coaching; lessons fed back into the Playbook to improve the next shift.
WM's truck technology stack already generates operational, behavioral and contextual data. SafeIQ integrates it rather than replacing it.
Technology provides the data. Integration creates intelligence. Coaching changes behavior. Continuous learning improves performance.
Three moments from a routine workday, validated with Collections drivers in Phase 1. Designed for the cab: fast, visual, minimal text, no interaction while moving.
Built once, reused for every line of business: content architecture, offline-first multi-device platform, governance charter, KPI framework and measurement chain, adoption playbook and supervisor coaching routines.
Added for each new line of business: line-specific risks and use cases, local content owners, a line governance committee, site and device onboarding, and baselines and targets for that line's KPIs.
Every interaction creates a measurable signal. The chain connects what the driver sees, what the driver does, how the supervisor responds, whether behavior changes and whether risk declines. WM's seven required KPIs are grouped under adoption, behavior change and risk reduction, each backed by simple behaviors we can measure from day one.
| WM KPI | Starter leading behaviors we measure |
|---|---|
| Driver adoption and active use | Pre-trip briefing completed; driver logs issue or idea at a stop |
| Behavior change in high-risk activities | Backing to the standard method; securing and rollaway checks done; safe driving checks (observed) |
| Supervisor coaching integration | At-risk observations coached on time; coaching follow-up completed |
| Context-aware learning effectiveness | Prompts acted on, not dismissed; microlearning done at the point of risk |
| Operational behavior and leading indicators | Pre-trip steps done, including clearance check; post-trip steps completed |
| Risk reduction and outcome alignment | Hazards and near misses reported; hazards closed on time |
| Responsiveness and continuous improvement | Input or RCA to updated standard; driver suggestions submitted |
Dashboards trigger decisions, not just report numbers. Structure and sample data only; baselines and thresholds are set with WM in Phase 1.
A&M provides single-point accountability across six phases, coordinating technology partners and WM stakeholders. WM provides SMEs, an internal project manager and the Driver Training Team as integration partner. Select any phase or gate to see what it delivers and what WM decides.
A&M brings technology enablement without being technology-led, and a design built for enterprise scale. Named team, grades and time commitment by phase are confirmed before contracting.
Managing Director, A&M · Engagement lead
Single point of accountability across all six phases, including partner-delivered work.
Phases 1–2
Field research with drivers and supervisors; Driver Safety Principles; KPI framework.
Phase 3 & partner coordination
Platform path, integration with WM tablets and existing signals, offline testing, KPI data feed.
Phases 5–6
Adoption strategy, coaching workflow, governance charter and handover to WM.
Phase 4 · with WM's Driver Training Team
Training alignment mapping, impact register, reinforcement recommendations.
Cross-phase
Performance coaching design, motivational drivers for game-based learning, HOP integration into coaching and governance.
Digital standardized work for heavy industry. The WorkD app automates and integrates safety into pre-start routines and inspections. Candidate platform for real-time, field-based, geofenced guidance.
Fleet data and AI algorithms for driver behavior. Candidate source of existing behavior analytics and coaching logic.
The platform path (Vexillum, MaxMine or a custom build) is confirmed in Phase 1 against WM's tablets, existing signals and ownership requirements. Prime and subcontractor structure to be confirmed.
Heavy-industry and industrial-services experience where standardized work must succeed at the point of work.
Field workflow and contextual guidance, using the right platform without letting it define the operating model.
Behavioral science, performance coaching and HOP so the Playbook changes decisions, not only content delivery.
Governance, content architecture and platform decisions set so the Collections pilot becomes a repeatable WM model.
WM owns the operational future: its data, safety standards, technology decisions and long-term governance. A&M is technology-agnostic and does not sell software, SaaS or hosting. We transfer knowledge and build internal ownership. Continued A&M advisory support is optional.
A large open-pit mine had a high rate of haul-truck overspeed events on downhill ramps. A&M installed vehicle data loggers across 500+ vehicles, defined behaviors and thresholds, gave operators real-time and post-shift feedback, and equipped supervisors with daily alerts, event replay and coaching tools.
Why it matters to WM: objective vehicle data and timely feedback changed operator behavior at scale, with supervisors coaching where it mattered.
A large mining operation had a mature work management system but inconsistent field execution on paper. A&M structured work into step-by-step elements, deployed a technician app with task-specific instructions, images, tools and PPE, integrated it with SAP, and trained crews and supervisors.
Why it matters to WM: structured work, built-in safety checks and step-level confirmation changed frontline behavior in a live operating environment.
A listed construction group was constrained by crane logistics and paper-based crew control. IoT crane loggers tracked lifts and SOP compliance; a simple operator app needed no training and nothing typed during lifts; daily and weekly coaching used automatic data, not self-reporting.
Why it matters to WM: one-week site implementation, frontline adoption without distraction from the work, and coaching on measured behavior.
Phase durations, pilot cohort and pilot length are set with WM during contracting, so the delivery sequence below is relative, not to scale. Phase 4 runs alongside Phases 1 to 3; the governance committee stands up before Gate 4 and operates after.
Field research, KPI definitions and baselines, platform path. WM approves the design framework, KPI baselines and platform path.
Design and prototype, tested in the field with drivers. WM approves content architecture and prototype as the build specification. Phase 4 training alignment runs alongside Phases 1 to 3.
Build with technology partners; beta test in the field. Offline tests passed on WM tablets, training aligned, supervisors ready to coach. Phase 5 adoption plan prepared.
Usage, behavior, coaching and outcomes tracked against the baseline; first proof point is disposal-site backing guidance. Governance committee stood up (Phase 6). WM's governance committee decides to scale, adjust or extend.
Align the path — confirm the Collections-first scope and the six-phase, four-gate delivery model with WM Supply Chain.
Mandate the team and governance — appoint the executive sponsor and Corporate Safety Director(s), and commit SMEs, the project manager and the Driver Training Team.
Set the baseline at Gate 1 — agree KPI definitions, baselines and the platform path so every later decision uses the same measurement chain.
Begin with the Collections pilot, prove the measurement chain, and build the enterprise template once — reused for every line of business.